Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/airconco/staging.aircon.com.au/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-terms-conditions domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/airconco/staging.aircon.com.au/wp-includes/functions.php on line 6114
Deployment of a Air-Cooled Chiller Rental | Aircon rentals Skip to main content

For Commercial & Industrial Hire

search
0
Location: Coffs Harbour  |  Sector: Healthcare

The Challenge

The hospital’s central cooling plant had an existing air-cooled 1200kW chiller that needed upgrading. Complicating the situation was the fact that the central cooling plant was located away from the main hospital structure.

The Solution

Deployment of a unique 1300kW air-cooled chiller, mounted on a specially-designed 40ft semi-trailer.

The Impact

The ease of installation and removal, without the need for a crane equipment or additional expenses, saved the client thousands of dollars and time in mobilisation.

Product

1300kW air-cooled chiller

Turnaround Time

7 Hours

Duration

12 Weeks

Project Steps

Assessment  • Deployment
Installation  • Commissioning
Operation  • Demobilisation

The Solution

In collaboration with our client, a leading multi-national chiller OEM and HVAC service provider, and the end client consultant, Aircon Rentals participated from the engineering planning phase to the actual chiller hire project implementation. Our solution was the deployment of a unique 1300kW air-cooled chiller, mounted on a specially-designed 40ft semi-trailer. This trailer was equipped to store hoses, electrical cabling, electrical distribution, and a recirculating chilled water pump, making it a unique offering in the Australian chiller rental market. Leveraging our own Aircon Rentals prime mover, we were able to efficiently deliver, install, and later demobilise the chiller without incurring any extra costs on cranes or rigging.

The Impact

In collaboration with our client, a leading multi-national chiller OEM and HVAC service provider, and the end client consultant, Aircon Rentals participated from the engineering planning phase to the actual chiller hire project implementation. Our solution was the deployment of a unique 1300kW air-cooled chiller, mounted on a specially-designed 40ft semi-trailer. This trailer was equipped to store hoses, electrical cabling, electrical distribution, and a recirculating chilled water pump, making it a unique offering in the Australian chiller rental market. Leveraging our own Aircon Rentals prime mover, we were able to efficiently deliver, install, and later demobilise the chiller without incurring any extra costs on cranes or rigging.