Location: Queensland | Sector: Production
The Challenge
The bottling plant was experiencing reduced capacity in one of its key production machines due to the current air-cooled chillers not able to meet demand. This was at a key production period before summer, with the plant at maximum output. Equipment was required to be installed into a secure plant enclosure close to the manifold connections and electrical supply.
Product
160kW Air-cooled Chiller,
Heat Exchanger and Pump
Turnaround Time
8 hours
Duration
16 Weeks
Project Steps
Assessment • Engineering
Deployment • Installation
Commissioning • Operation
Demobilisation
The Solution
Aircon Rentals engineers designed and deployed a 160kW air cooled chiller, plate heat exchanger (as a secondary loop), pumps and ancillaries. Our solution also provided additional capacity should the existing chiller fail. Working with the client, Aircon Rentals scheduled the installation during the plant production period with minimal commissioning time required.
The Impact
The ease of installation without the need for a crane equipment or additional expenses, saved the client thousands of dollars and time in mobilisation. With the rental chiller on line, production continued at a critical time and ensured the bottling plant was able to meet its contractual obligations to its key clients.